©2021 Morley Builders, Inc. | Privacy
Morley performed structural concrete services for this six-level 2,443 car design-build parking structure on the SDSU campus. The structure is a post-tensioned, long-span structure with 24-foot-wide bays, six inch slabs and 36 inch beams.
Approximately 22,200 cubic yards of concrete were used to complete the project.
Project Size:
- 710,068 gsf
- 2,443 parking spaces
Owner:
San Diego State University
Design Architect:
Walker Parking Consultants