©2021 Morley Builders, Inc. | Privacy
The 124,649 gsf facility showcases best-in-league amenities made for elite professional athletes. Player’s facilities include an indoor-outdoor lounge, screening room, training and locker room with a resistance pool, dual cryogenic chambers, multiple whirlpools, steam room, barber shop, a weight/conditioning facility and dining facility.
The second floor houses offices for business and basketball operations and arena capacity for 750 fans. The additional training facility includes locker rooms, lounge and shower areas. There are corporate team and coaches’ offices, spaces for sponsor functions, multipurpose conference rooms/studio and a press room.
The new training center is designed for health excellence. The Lakers partnership with the forward-thinking medical team at UCLA Health is providing a place that not only treats, but prevents injuries, translating into the ultimate goal of helping the players perform better on-court, while prolonging their professional careers.
Fans can spot the iconic Laker fins on the second level of the glass curtain wall system. Inspired by the transparent nature of the ocean, the glass wraps the entire second level for maximum daylighting. A rain screen of light colored vertical steel fins wraps the entire west, south and east side. The fins are rotated to allow morning sun from the east while shading the afternoon and evening sun from the south and west.
Project Size:
124,649 gsf
Owner:
Los Angeles Lakers
Design Architect:
ROSSETTI, Perkins + Will
LEED Rating:
Platinum
Awards:
- Commercial Real Estate Award, Los Angeles Business Journal
- LA Business Council Architectural Award - Commercial Office Building and Headquarters